Monday, December 05, 2005

My first post-IBM project ... (4)

Half way done with tiling the bathroom...


Image020.jpg
Originally uploaded by jmeyer.



Man, because the darn room is so narrow, we chose a diagonal pattern. As it turns out, out of roughly 45 tiles, only 6 of them did not need to be cut... Makes for extremely fast tiling. ( ... Got the whole thing tiled by 7pm ... ). Tomorrow I will do the grout, maybe paint the walls and then install a new toilet and voila, the (almost) new bathroom will be ready.

No comments: